Kargil, Apr 10 : The district administration on Thursday reviewed the status of irrigation channels across Kargil, with emphasis on timely restoration, improved assessment mechanisms, and long-term water management strategies to support agricultural activity.
The meeting, chaired by Additional District Development Commissioner Ghulam Mohd (JKAS) at the NIC Hall in Baroo, brought together officials to assess both minor and major irrigation khuls, which form the backbone of the region’s agrarian economy.
Officials informed the chair that mechanical assistance would be deployed wherever feasible to clear blockages and undertake restoration works in damaged channels. The administration also deliberated on introducing a uniform format to assess damages and requirements, with a decision taken to adopt a standardised mechanism for better coordination and planning.
The issue of fuel requirements for machinery operations was also discussed, with assurances that necessary provisions would be arranged to ensure uninterrupted restoration work.
Flood-related vulnerabilities affecting irrigation infrastructure were reviewed in detail. Officers shared ground-level assessments and outlined mitigation measures aimed at reducing disruptions during peak agricultural periods.
In a parallel effort to augment water availability, the administration announced plans for the construction of five ponds in Drass, Chiktan and Sankoo. These ponds are expected to support irrigation needs in surrounding agricultural fields, particularly during lean water periods.
Discussions also focused on strengthening water sources through sustainable approaches, including snow harvesting and improved water catchment systems. The administration underlined the importance of adapting to changing climatic patterns by diversifying water conservation methods.
Officials further informed the meeting that 20 ponds have been identified by the Department of Irrigation and Flood Control, of which six are scheduled for completion before April 12. These include three ponds in Zanskar and one each in Haqnis, Gindiyal and Lamar in the Drass region.
Chairing the meeting, the Additional District Development Commissioner called for coordinated action among departments, stressing the need for timely intervention and systematic planning to ensure uninterrupted irrigation facilities for farmers across the district.
The meeting concluded with directions to all concerned departments to expedite implementation of the measures discussed and maintain close monitoring of irrigation infrastructure in the coming weeks.
